Wang Guo Liang

Wang Guo Liang

contractor unknown

Wang Guo Liang is a 50-year-old contractor with the China Civil Engineering Construction Corporation (CCECC), involved in the Standard Gauge Railway (SGR) project in Tanzania, who was recently assaulted while thwarting a series of fuel theft attempts at the construction site.

Born on Sep 11, 1976 (50 years old)

Global Media Ratings
Dominance
0.00%
Persistence
0 wks
Reach
199,780
Power
211$
Sentiment
7.00
Countries Mentioned
Country Mentions Sentiment Dominance + Persistence x Population = Reach x GDP (millions) = Power
Tanzania 1 7.00 0.33% +0% 59,734,213 199,780 $63,000 211$
Totals 1 59,734,213 199,780 $63,000 211$
Interactive World Map

Each country's color is based on "Mentions" from the table above.